Prefer controls that remove the hazard (eliminate) before adding training or EAP only (lower on the hierarchy). Each High-band hazard needs an owner and due date before steering sign-off.
0
Actions total
0
Eliminate-first
0
Minimise
0
Overdue
Control register
+ Add control| Control | Level | Owner | Due | Status |
|---|
New control
Eliminate (remove hazard)
Minimise (engineering / systems)
Sign-off checklist
Controls on the register
Owners assigned